Mount Vernon, Indiana · Posey County
Home builder in Mount Vernon, Indiana
Build on your own lot in Mount Vernon, New Harmony or anywhere in Posey County, or in Farmington Ridge in Poseyville.
Our Work
Homes we’ve built in Posey County
Including a Parade of Homes entry in Mount Vernon and a custom home on State Road 69.
Semi-CustomMount Vernon, INMt. Vernon, IndianaSee this home ›
Parade HomeMount Vernon, INGriner Parade HomeSee this home ›
CustomMount Vernon, INAnslinger HomeSee this home ›
CustomNew Harmony, INState Road 69See this home ›
- Mount Vernon3
- New Harmony1
Since working with Reinbrecht Homes, we have seen nothing but quality, professional, and honest work.
Ryan S.Google review
Where To Build
Where you can build in Posey County
Farmington Ridge is in Poseyville, in the north of Posey County. Anywhere else in the county, we build on your land.
- Mount VernonPosey County, Indiana
- Our office, Haubstadt37 miles, about 49 min from Mount Vernon
- 1Farmington RidgePoseyville, 27 lots, $39,000 to $58,000
- All the places we build ›
How We Design
Your plan, your finishes
Semi-custom or fully custom, in Farmington Ridge or on your own land in Posey County. We’ve built more than 500 homes over 30-plus years, and every one starts the same way.
We start by getting to know you: how you live, and what you want from the house.
Personalize one of our 36 floor plans, or design a fully custom home. Then choose the finishes inside and out: cabinets, flooring, paint, trim, lighting, doors, siding and fireplace.
You review and approve everything before we build, and the quote has no hidden fees. Every part of the home, from the driveway to the roof, has a written standard. See what comes standard.
Building In Posey
What building in Posey County involves
The offices and utilities behind a new home here, so you know who does what.
- Permits
- On a semi-custom home, all permits, inspections and their costs are included in our price. Inside the city, the Mount Vernon Building Commissioner. In unincorporated Posey County, the county Building Commissioner, after an Improvement Location Permit from the Area Plan Commission.
- Water & sewer
- The city runs both: the Mount Vernon Water Utility and the Wastewater Department.
- Septic
- Septic permits come from the Posey County Health Department.
- Electric & gas
- CenterPoint Energy serves Mount Vernon for electric, and supplies natural gas in Posey County.
Utility service depends on the exact lot. We confirm it for yours before you sign.
Floor Plans
Start from a plan that already works
Thirty-six plans, 1,102 to 3,726 square feet. Every one can be personalized, and the price is the same wherever you build.
Cedar$226,7001,276 sq ft3 bd2 ba1 car
Locust$327,4001,950 sq ft3 bd2.5 ba2 car
Peach$313,9001,945 sq ft3 bd2 ba2 car
Hemlock$337,1002,438 sq ft3 bd2.5 ba2 car
Plan prices do not include the lot. Renderings are for marketing and may vary slightly from construction drawings.
Paying For It
Little up front, nothing during the build
Free construction financing works with a standard mortgage, FHA, VA or USDA loan.
Put down as little as a thousand dollars. That is your only out-of-pocket cost between signing and closing.
No interest-only payments on a construction loan while we work. See the financing terms.
Selections, change orders, photos and the schedule live in Buildertrend, so you can follow the build from home.
Questions
Building in Mount Vernon: FAQs
Something not covered here? Send us a note and someone on the team will get back to you.
Do I need an Improvement Location Permit?
Only outside the towns. In unincorporated Posey County (outside Mount Vernon, New Harmony, Poseyville and Griffin), a new home needs an Improvement Location Permit from the Area Plan Commission before the county building permit. Inside Mount Vernon, the city Building Commissioner issues the permit.
Is my Mount Vernon lot on city water and sewer?
Inside Mount Vernon, yes: the city runs both the water utility and the wastewater department. Lots outside a sewer area need a septic permit from the Posey County Health Department.
Is Farmington Ridge in the Mount Vernon school district?
No. Farmington Ridge is in Poseyville, in the north of the county, so it is in the MSD of North Posey County schools. Mount Vernon itself is in the MSD of Mount Vernon. Farmington Ridge has 27 lots, $39,000 to $58,000.
How long does it take to build in Mount Vernon?
A semi-custom home generally has about a month of pre-construction, then about six months of construction. A fully custom home takes longer: two to three months of pre-construction and eight to ten months to build.